Secured Trading Service

Durable Tunnel System with Steel Frame Formwork Accessories

  • Audited Supplier
  • 2 yrs

Contact Supplier

Product Highlights

  • Cost-Effective Alternative: 1/3 the cost of aluminum formwork with comparable performance and superior strength.
  • High Reusability: Reusable up to 300+ cycles for multiple units, minimizing material consumption.
  • Customizable Dimensions: Width options from 100mm to 600mm and length from 0.2m to 3m.
  • Superior Material Strength: Tensile/Yield strength of 850 MPa with 1.5mm thick cold-rolled high-strength steel alloy.
  • 1 Year Warranty: Comprehensive 1-year warranty coverage for all mechanical defects.
  • ISO Certified Quality: Manufactured with ISO certification ensuring strict quality control and safety standards.
  • Full Customization Support: ODM and OEM services available with flexible customization from samples or designs.
  • Structural Stability: Stable and deformation-resistant design ensuring precision and integrity during concrete pouring.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Durable Tunnel System with Steel Frame Formwork Accessories

Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories pictures & photos
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories pictures & photos
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories pictures & photos
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories pictures & photos
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories pictures & photos
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories pictures & photos
Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
    Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
    Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
    Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
    Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
    Durable Tunnel System with Steel Frame Formwork Accessories
  • Durable Tunnel System with Steel Frame Formwork Accessories
    Durable Tunnel System with Steel Frame Formwork Accessories

Find Similar Products

Product Description

Product Description
High-Strength Alloy Steel Formwork
INNO High-strength Alloy Steel Formwork is a revolutionary new building formwork. It is made of high-strength alloy steel, integrally formed, laser-automatically welded, and can be reused 300 times.Its waterproof and anti-rust via easy to clean. Its spray painted with polymer composite. Its cost is only one-third of that of aluminum alloy formwork, and it can be perfectly connected with the aluminum alloyformwork system, which can completely replace aluminum alloy formwork, shorten the construction period, and greatly reduce the construction cost. High-strength alloy steel formwork is an environmentally friendly building formwork.
Specification
Primary Function
Durable Tunnel System with Steel Frame Formwork Accessories
Cost Efficiency: 1/3 price of aluminum formwork
Superior Performance: Triple resistance(compression/tension/bending)
Extended Durability: 300+ reuse cycles
Product Features
Alloy Steel Formwork
Primary construction using alloy steel templates (75% standard components).  
Flexible Design: 
Custom solutions available (all-steel, steel-aluminum, or steel-wood composite).  
Robust Wall System: 
Tie-rod reinforced walls with multi-layer channel supports (400mm wide panels).  
Rapid Stripping: 
Early-stripping system for beams and slabs with indepen-dent steel props (1200x1200mm spacing).  
 Optimized Stripping: 
Utilizes 200P200 stripping heads and 200P1000 flat strips.Versatile Connections: Dedicated connectors for seamless steel-wood composite integration.  
 Ideal Applications: 
Standard floor structures, urban utility tunnels (pipe galler-ies).  
Comparison Item
High Strength Alloy Steel Formwork
Competitive Edge vs. Other Formworks
Turnover Count
300 times
Highest reuse rate (vs. 8–200 times for others)
Composite Cost
Secondary (Mid-range)
Lower long-term cost due to extreme durability
Renovation & Recycling
Low renovation need + Callable preferred stock
Eco-friendly, minimal maintenance cos
Corrosion Resistance
Good
Outperforms steel/aluminum; better than plastic
Impact Strength
High
Matches steel/aluminum; avoids wood/plastic fragility
Deformation Resistance
Resistant to deformation
No warping (vs. wood/plastic deformability)
Durability
Not prone to damage (destructive tests)
Outlasts wood/plastic; matches steel/aluminum
Production Scalability
Secondary (No high-standard EIA required)
Easier to scale vs. aluminum's strict equipment needs
Core Merit
Optimized combination of all market-leading template features
Balances strength, cost, and usability better than any single alternative
Aluminum Formwork Replacement Fields 
Infrastructure: 
Highways/Bridges/Tunnels/Ports 
 
Construction: 
Factories/Municipal Projects/Skyscrapers 
 
Special Applications: 
Heavy-load structures/Complex concrete pours 
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
Certifications
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
After Sales Service
Standard Warranty: 12 months or 2,000 operating hours, whichever is first.
Extended Warranty: Optional coverage extends up to 36 months.
Global Support: Round-the-clock technical support and parts supply.
Training: Training available on-site or remotely for operation/maintenance.
Company Profile
Durable Tunnel System with Steel Frame Formwork Accessories
Hunan Inno New Material Technology Co. Ltd.
Located in Changsha, Hunan Inno New Material Technology Co. Ltd. is a leading building materials enterprise specializing in scaffolding, Ring lock, steel formwork, aluminum formwork, and trading. We prioritize integrity and quality, adhering to a 'customer-first, service-oriented' philosophy.
Dedicated to delivering premium products and services worldwide.
Durable Tunnel System with Steel Frame Formwork Accessories
Durable Tunnel System with Steel Frame Formwork Accessories
WHAT CAN WE DO
No
Construction Type
Building Type
Construction Scope
Scaffolding System Selection
Formwork System Selection
Exterior Wall Insulation & Finishing
1
New building main structure concrete pouring & exterior wall treatment
High-rise building
Top non-standard floors
Cantilever scaffolding
Ringlock scaffolding
Cup-lock scaffolding
Frame scaffolding (Eagle frame)
Wood formwork + 48-series ringlock system
Foam ceramic insulation & decoration integrated panel
Mid standard floors
Self-climbing platform
Hot-dip galvanized electric hoist climbing system
Steel props + high-strength alloy steel formwork
Podium, basement garage, open floors
Ringlock scaffolding
Ringlock + wood formwork & Ringlock + steel formwork

Basement
N/A
Ringlock + wood formwork & Ringlock + steel formwork

2
Exterior wall renovation of existing buildings
High-rise building
Full exterior wall
Guided rail lifting platform


FAQ
Q: What's the lead time for orders?
A: Standard models ship within 15–30 days; custom units take 30–45 days.
 
Q: Do you provide after-sales service overseas?
A: Yes, we have partnered service centers in Malaysia.
 
Q: Can I request a customized?
A: Absolutely! We offer tailored attachments.
 
Q: What documents do you provide for export?
A: Comprehensive export package including Commercial Invoice, Packing List, Bill of Lading, etc.
 
Q: How do I place an order?
A: Reach out via email or phone for a quote, then confirm with a Purchase Order.
Q:Can you do OEM/ODM?
A:Yes, OEM/ODM is available

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASI2492026". Items marked "verified" are certified.

Watch Video
Watch Video
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.
Hunan INNO New Materials Technology Co., Ltd.

About Our Factory & Business Background

verified Business Type
Trading Company
Address
Room 1031, Building B4, Taskin City Plaza, No. 18, Xiangfu Middle Road, Jingwanzi Sub-District, Yuhua District, Changsha City, Changsha, Hunan, China
verified Registered Capital
2,000,000 RMB
verified Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: one month
verified Nearest Port
Shenzhen Port;Changsha Port;
verified Minimum Order Quantity
1 Pcs

Our Production Capability & Technical Expertise

Main Products
Self Climbing Platform, Scaffolding, Ringlock Scaffolding, Formwork, Steel Formwork, Concrete Mould, Slef Climbing Scaffolding, Climbing Scaffolding, Construcation Mould, Safety Protection Platform
verified Inspection Type for Finished Products
100% inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Finished product checked by packing staff
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified Traceability of Raw Materials
Yes

Our Industry Experience & Global Business Record

verified Main Markets
Southeast Asia/ Mideast
verified New Products Launched in Last year
No

FAQ

What is the warranty period for the formwork?
We provide a 1-year warranty for all our steel formwork products.
Can the dimensions of the formwork be customized?
Yes, the width is customizable from 100mm to 600mm, length from 0.2m to 3m, and panel thickness is also customizable.
How does the cost compare to aluminum formwork?
Our steel alloy formwork costs approximately 1/3 of aluminum formwork while offering comparable performance.
What is the maximum number of times the formwork can be reused?
The formwork is designed to be reusable up to 300+ cycles.
Do you offer OEM and ODM services?
Yes, we offer full customization, minor customization, and flexible customization services including OEM and ODM.
What is the minimum order quantity?
The minimum order quantity is 1 piece.
What is the lead time for production?
The average lead time is one month for both peak and off-peak seasons.
Is the product ISO certified?
Yes, our products are ISO certified and undergo 100% visual and function inspection.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now